000 | 02021nam a22002417a 4500 | ||
---|---|---|---|
005 | 20160211103144.0 | ||
008 | 160201b1969 xxu||||| |||| 00| 0 spa d | ||
041 | _aeng | ||
082 | _a617.6922 J72m2 | ||
100 |
_aJhonston, Jhon F. _93437 |
||
245 |
_aModern Practice in Crown and Bridge Prosthodontics / _cJhon F. Johnstons; Ralph W. Phillips; Ronald Dykema |
||
250 | _a2a. Ed. | ||
260 |
_aPhiladelphia _bW. B. Saunders Company _c1969 |
||
300 |
_aXIII, 599 p. ; _bil. ; _c26 cm. |
||
504 | _aIncluye bibliografía e índice | ||
505 | _aPreoperative study -- Differential diagnosis selection and planning of treatment --Cutting instruments -- Tooth reduction -- The full veneered gold crown -- The partial veneer crown -- The Pinledge retainer -- The Inlay retainer -- The MacBoyle retainer -- The working cast -- Individual die construction from tube impressions -- Was patterns -- Spruing, investing, and casting -- The pontic -- Pontic form-- Soldering -- Glazing and staining facings -- Checking and cementing the bridge -- The veneered gold crown -- -- Porcelain furnaces -- The Construction of bonded porcelain restoration -- The Construction of bridges with bonded porcelain veneers – the porcelain Jacket Crown -- The Construction of crowns and bridges with resin veneers – The resin jacket crown – Bridge patterns – Splinting teeth -- The Construction of crowns and bridges in the preparation of partially edentulous mouths for clasp-retained removable prostheses -- Orthodontic positioning of abutment teeth – Crown and bridge procedures for the Young-Age Group – The restoration of mutilated anterior teeth -- Occlusion factors before and bridge construction -- Bridge failures: Indications and corrective measures complete Oral rehabilitation -- Case Histories | ||
650 |
_aRehabilitación _vOral _93405 |
||
650 |
_aPrótesis _vOral _93438 |
||
700 |
_aPhillips, Ralph _93439 |
||
700 |
_aDykema, Roland _93407 |
||
942 |
_2ddc _cLIBRO-GRAL |
||
945 |
_aMLMS _d2016-02-11 |
||
999 |
_c1496 _d1496 |